Ohio Housing Finance Agency       57 East Main Street | Columbus, OH 43215

 

 

 

 

 

HUD Releases Income Limits for FY2016

 

On March 28, 2016, HUD released the 2016 Multifamily Tax Subsidy Project Income Limits (MTSP), with an effective date of March 28, 2016. These limits are now loaded into our database system, DevCo. The MTSP limits are issued in response to changes in the income limit methodology as required under the Housing and Economic Recovery Act of 2008. The MTSP limits include HERA special limits, which are income limits "held harmless", meaning changes in median income are not reflected.. Please note there are changes in the number of counties for which HERA limits are available. If a county has been identified as a "HERA county", only buildings meeting the criteria described below may use the HERA limits. Non-impacted limits are income limits that are not held harmless. The MTSP limits are for use by tax credit and multifamily bond projects only. OHFA has posted on its website the MTSP Income and Rent limits based on the 50% and 60% of AMI respectively. The 2016 Income and Rent Limits file can be downloaded here.

 

The applicable income limit for a tax credit or multifamily bond project is based on the year in which the building is placed in service and the county in which the building is located.

 

For new construction projects, the placed in service date is generally the date on which construction is completed and a certificate of occupancy is issued; the placed in service date for purposes of applying the income and rent limits for acquisition and rehabilitation projects is the date of the acquisition of the building(s). Buildings within projects may have various placed in service dates so owners should use caution when selecting the income limit(s).The income limit for a building is based on one of the following four criteria: 

  1. Buildings placed in service prior to 1/1/2009 apply the HERA special limit, if the county was assigned a HERA limit in 2012 or a prior year, or the highest of the 2009- 2013 MTSP income limits apply. Note: projects placed in service on or after 1/1/2009 cannot use the HERA special limits.
  2. Buildings placed in service on or after 1/1/2009, but before the issuance of the MTSP limits by HUD on 5/14/2010, apply the higher of the 2009-2015 MTSP non-impacted income limits. Note: projects placed in service on or after 1/1/2009 cannot use the HERA special limits. 
  1. Buildings placed in service on or after 5/14/2010 apply the highest of the 2010 or the highest non-impacted MTSP income limit issued after 5/14/2010.

In a previous memo, OHFA advised that projects allocated credits in 2008 could use the HERA limits when placing units in service. After further consideration, OHFA is advising projects allocated credits in 2008 or beyond to use the appropriate non-HERA limit. Doing so will ensure residents are qualified and charged rent based on the most appropriate income information. 

 

IRS Low Income Housing Newsletter #35 includes a helpful discussion regarding when income limits are determined for a tax credit building. Projects placed in service after 1/1/2009 may use the higher of the non-impacted income limit in effect at the placed in service date or the latest non-impacted income limit. Once an income limit is established at the placed in service date, an owner is not required to decrease the income limit if the non-impacted limit in any subsequent year decreases. Project rents are also calculated based on the higher of the non-impacted income limit in effect at the placed in service date or the latest non-impacted income limit. An owner may follow the guidance established in IRS Revenue Procedure 94-57, which describes the process for electing a gross rent floor. 

 

Based on the placed in service date and the date the gross rent floor is elected, a project could have a rent floor based on an income limit higher than the limit used to determine occupancy. Owners seeking additional guidance regarding the appropriate tax credit (the HOME program limits are not available through this tool) income and rent limits and gross rent floor may wish to refer to the Novogradac & Company rent and income calculator

Note: Use of the Novogradac rent and income limit calculator is not a safe harbor for violations of rent and income restrictions. Projects constructed orrehabilitated using HOME or OHTF but not tax credits or multifamily bonds, must continue to use the 2014 HOME income and rent limits until HUD issues the 2015 HOME income and rent limits. Tax credit projects with either HOME or OHTF must use the current HOME limits for all HDAP-assisted units.The HERA income and rent limits cannot be used by projects financed with HUD programs, such as Section 8 or Rural Development 515 projects.

 

Owners have 45 days to implement the new limits or by May 12, 2016

.

 

Please direct any questions regarding this message to Betsy Krieger by email at bkrieger@ohiohome.org.

 

STAY CONNECTED:

Like us on Facebook

Follow us on Twitter